I would say get it to her as soon as you can. If it's easier and more accurate to wait, then you should do that.
Thanks,
Mary
________________________________
Von: Wendy Thomas [mailto:wlt at pop.umn.edu]
Gesendet: Mo 20.04.2009 13:36
An: Mary Vardigan
Cc: Mary Vardigan; TIC list; Sanda Ionescu
Betreff: Re: AW: AW: Timing of Schema vote
Mary,
The detailed list of changes will be provided with the 3.1 schemas and
Part I and II draft. The vote should open two weeks after the content is
distributed. If I send Sanda the summary verbage when I send the materials
is that soon enough or does she need it before then. Its just easier to
summarize after I see the whole package and verify what has been updated.
Wendy
On Mon, 20 Apr 2009, Mary Vardigan wrote:
> OK, thanks, Wendy. Note that I am in Mannheim and then in Luxembourg, back in the office on Thursday, the 30th. If you could provide a statement of what is changing with links to the details, we could write up the text of the vote and Sanda could contact the voting company (http://www.campus-vote.com/) to get the process started.
>
> Thanks,
> Mary
>
> ________________________________
>
> Von: Wendy Thomas [mailto:wlt at pop.umn.edu]
> Gesendet: Mo 20.04.2009 10:12
> An: Mary Vardigan
> Cc: Mary Vardigan; TIC list
> Betreff: Re: AW: Timing of Schema vote
>
>
>
> Mary,
>
> Arofan is just finishing up the last updates to the schemas. Unfortunately
> he had to fly to Europe yesterday so I'm hoping to get this later today.
> Achim will need to create the html field level documents and I'm working
> on the drafts. I'd say realistically we are talking Wednesday earliest.
> This is a slight delay over the scheduled plan but still allows voting
> before IASSIST.
>
> It will be version 3.1
>
> Our versioning system is as follows: X.Y.Z
>
> Main number change (X) occurs when new functionality is added
> Change in Y occurs when there are backward incompatable changes which may
> or may not effect a user depending on which element subsets they use
> Change in Z reflects backward compatable changes only
>
> Wendy
>
>
> On Mon, 20 Apr 2009, Mary Vardigan wrote:
>
>> Hi, Wendy. Since I am in Mannheim this week, Achim and I talked about this a bit. Is your timing still roughly the same? And will this be 3.01, 3.1, or neither?
>>
>> Mary
>>
>> ________________________________
>>
>> Von: Wendy Thomas [mailto:wlt at pop.umn.edu]
>> Gesendet: Do 19.03.2009 14:45
>> An: Mary Vardigan
>> Cc: TIC list
>> Betreff: Timing of Schema vote
>>
>>
>>
>> Mary,
>>
>> I believe our original time line had us getting the revised schemas out
>> for review by the end of the first full week of April so that Expert
>> Committee members would have 2 weeks to review and then a week to vote
>> before the end of April. We have now gotten through all of the existing
>> bugs but have run into a bit of a scheduling problem terms of getting the
>> updated schemas and field level documentation updated along with
>> preliminary updates to the higher level metadata.
>>
>> We would like to extend the deliver date to April 19th. This moves the
>> review to the last two weeks of April and a vote during the first week of
>> May. Essentially this only moves it back one week from original plan so we
>> are hoping it will not be a problem.
>>
>> Please note that we would once again put out the vote as a vote of
>> approval on the schemas to include agreed changes that arose during review
>> (typographical corrections, documentation improvement, etc.). For example
>> Parts I and II may only be in draft form during the review period.
>>
>> On a related note, I will be creating an updated verion of DDI 3.0 Part I
>> and II to reflect comments received during workshops and best practice
>> development. This version will continue to be supported through improved
>> documentation and the Best Practice publications developed at Dagstuhl.
>>
>> Please let us know if this scheduling change causes major problems. Our
>> primary concern is that due to other committements we won't get a chance
>> to work on the schemas until April 5 and we need two weeks to make sure we
>> are accurate in the updates.
>>
>>
>> Wendy
>>
>> Wendy L. Thomas Phone: +1 612.624.4389
>> Data Access Core Director Fax: +1 612.626.8375
>> Minnesota Population Center Email: wlt at pop.umn.edu
>> University of Minnesota
>> 50 Willey Hall
>> 225 19th Avenue South
>> Minneapolis, MN 55455
>>
>>
>>
>
> Wendy L. Thomas Phone: +1 612.624.4389
> Data Access Core Director Fax: +1 612.626.8375
> Minnesota Population Center Email: wlt at pop.umn.edu
> University of Minnesota
> 50 Willey Hall
> 225 19th Avenue South
> Minneapolis, MN 55455
>
>
>
Wendy L. Thomas Phone: +1 612.624.4389
Data Access Core Director Fax: +1 612.626.8375
Minnesota Population Center Email: wlt at pop.umn.edu
University of Minnesota
50 Willey Hall
225 19th Avenue South
Minneapolis, MN 55455
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://www.icpsr.umich.edu/pipermail/ddi-srg/attachments/20090421/dec5cd87/attachment-0001.html
More information about the DDI-SRG
mailing list